Case Study

Homebuilder

The challenge

This customer is one of the UK’s premier home builders, and for this new development they needed a temporary power solution that would deliver on impact, whilst minimising emissions in line with their commitment to sustainable building practices. Carbon reduction and environmental protections are one of their key ESG pillars, so we needed to build a solution that helped them deliver their project effectively, whilst minimsing impacts on the local community and ecology.

This project had a four cabin set up of working and welfare spaces, as well as a large footprint site with multiple active working areas that all needed power supply.

The solution

Our team built a bespoke site set up that utilised our Battery Energy Storage Solutions (BESS) alongside a 100kVA generator and an advanced cable and distribution system. This allowed us to deliver high impact power to every area of the site that needed it, without using multiple diesel generators, minimising emissions, cost and creating operating efficiencies.

Utilising battery systems also builds out contingencies, so you’re never left without power. Increased reliability that keeps your teams working no matter what comes up during your project.

The results

19,807

kg’s of emissions saved

78%

reduction in run hours and fuel consumption

€10,480+

fuel cost saving

housing
arial village

Project completed safely and efficiently, emissions reduced and fuel costs slashed.

View our other case studies

Questions?

Contact us today:

+353 (0) 1 897 5290

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
+353 (0) 1 897 5290